If you are a college or university looking to setup a complete lab. Please contact us with your details for custom quotation. sales@aticoexport.com

Assembly and Alignment Of Pumps And Drives

We are the leading manufacturer and supplier of Assembly and Alignment Of Pumps And Drives. Now accepting bulk orders for government tenders in every major country around the globe.

A complete work process when repairing work machines such as pumps consists of the following steps: assembly – alignment – test. The trainer described here was designed with industrial conditions in mind and is primarily intended for the practical training of maintenance engineers. It also offers a variety of topics and starting points for training in vocational schools.

The trainer enables students to practise the entire maintenance process. On its own, the trainer can be used for assembly exercises with the option of aligning the drive and the pump. Combined with Assembly station: pipes and valves and fittings, the trainer can be used as a test system for the completely assembled piping system.

Learning Objectives And Experiments

  • Installing a pump in a system
  • Connecting and aligning motor and pump
  • Familiarisation with various alignment methods:
  • Straight edge, dial gauges
  • Familiarisation with key system components
  • Electrical installation of motor and switching elements
  • Assembly of pipes and instrumentation
  • Detail installation on a standard centrifugal pump
  • Reading and understanding engineering drawings, product documentation and circuit diagrams
  • Familiarisation with maintenance procedures
  • Planning assembly and maintenance steps
  • Operational testing in a pipe network

Specification

  • Mobile system for alignment of a standard pump and its drive motor
  • Asynchronous electric motor with constant speed
  • Electric motor with positioning frame and fit plates for alignment
  • Pump and motor connected via coupling
  • Checking of alignment using straight-edge or dial gauges
  • Manometer at pump outlet
  • Pump with ball valves at inlet and outlet
  • Closed water circuit
  • Part of the Practice Line for assembly, maintenance and repair

Technical Specification

  • Flange fittings
  • Grey cast iron
  • Nominal pressure: PN16 for DN15, 25 / PN10 for DN40
  • Ball valve with cutting ring screw fitting
  • Brass, nickel-plated
  • Nominal pressure: PN25
  • Nominal size: G1/2”
  • Manometer: 0…4bar

 

Tell us Your Requirements

Sending your message...



Your Cart

Your Cart is Empty! Go Shopping